Take a 60kVA Generator Off Daily Duty
60.8kWp Solar · 5 × SRNE 12kW hybrid · 150kWh LiFePO₄ · ₦55.9M, or from ₦47.5M




98 panels5 × 12kW5 × 30kWhTwo ways to buy this system
Both use the same inverters. The cheaper version has less battery and fewer panels, and you can add to it later without changing anything else.




80 panels5 × 12kW4 × 30kWh- 49.6 kWp of solar (80 panels)
- 120 kWh battery, about 7.2 hours at 15 kW overnight
- Payback 1.3–2.2 years
- Add 18 panels and a fifth 30kWh pack later.




98 panels5 × 12kW5 × 30kWh- 60.8 kWp of solar (98 panels)
- 150 kWh battery, about 9 hours at 15 kW overnight
- Payback 1.3–2.2 years
Installed prices for an outright purchase, as of October 2026. Product photos show the equipment used; the counts are on each picture.
Ideal For
Large school, mall unit or office building running a 50–60kVA generator
Secondary school or campus with several buildings
Mall anchor unit or large showroom
Office building with 60–100 staff
Factory with light daytime production
What This System Powers
15–20 units (1.5HP), or a mixed commercial load
Five inverters in parallel share the load.
Commercial cold storage around the clock
Full site lighting
All
Workstations, labs, servers and building systems
Multiple pumps
Commercial laundry: yes, within the inverter rating
Three-phase motors. Five inverters cannot be split evenly across three phases; use Business 72 on a three-phase site. Site survey and load audit required.
Battery Autonomy
Overnight Scenario
At a typical night-time load of 15kW (security, servers, cold storage and boarding areas), the 150kWh battery runs for about 9 hours. The cheaper version's 120kWh runs for about 7.2 hours.
System Specifications
| Solar Array | 60.8 kWp |
| Panels | 98 × Jinko Tiger Neo 620W N-type panel |
| Inverter | 60 kVA: 5 × SRNE 12kW hybrid |
| Phase | Single-phase |
| Battery Capacity | 150 kWh: 5 × Aurora 30kWh LiFePO₄ |
| Battery Chemistry | LiFePO₄ |
| Battery Cycle Life | 7-year warranty, over 6,000 cycles at 90% depth of discharge |
| Usable Battery Capacity | 135 kWh |
| Daily Solar Generation | 218.2 kWh |
| Monthly Generation | 6546 kWh |
| Solar Utilisation | 90% |
| Roof Space Needed | About 274 m² |
| Monitoring | InfraSol real-time remote monitoring platform |
Financial Payback
Savings are the solar energy a system produces and the customer uses, valued at what that energy costs them today. Output is 1,310kWh per kWp a year, the Lagos figure for a well-oriented, unshaded array after system losses; we count 75% of it as used in homes and 90% in businesses, and give the battery no credit for charging from the grid, so the payback is conservative. Generator fuel is derived rather than assumed: litres/hour ≈ 0.25 × kW drawn + 0.037 × rated kVA, at ₦1,920/litre. The second term is fixed burn proportional to the set's size whether or not anything is plugged in, which is why an oversized generator costs more per kWh than one that is worked hard. Most Lagos generators run at 40–70% of rating; across that band fuel alone costs ₦607–₦702/kWh on a well-maintained engine, about ₦640/kWh at a typical 55% load, and around ₦800/kWh on a worn, lightly loaded one. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120/kWh, which is what takes generator power past ₦700/kWh all-in. Band A grid is taken at ₦210/kWh. Conservative (₦366/kWh blended avoided cost): Band A home, 14–18 hours of mains, load weighted to the evening. Base case (₦531/kWh): Band B/C small business, roughly 10 hours of mains, mid-life generator. Optimistic (₦625/kWh): Band C/D commercial site with minimal grid and heavy daytime load. The more of your consumption falls in daylight hours, the faster the payback.
The Diesel Reality
A 60kVA generator running 14 hours a day burns roughly 2,950–4,460 litres of diesel a month, depending on how hard it is worked. At ₦1,920 a litre that is ₦5.7M–₦8.6M a month in fuel alone, before servicing, oil changes and the diesel that goes missing. Ask about lease-to-own or Energy as a Service if you would rather not pay up front.
Already on Band A?
Band A businesses still benefit. The array carries daytime operations, when a business draws most of its power, and the battery covers outages and the evening tail instead of the generator. Charged from Band A mains, stored energy costs about ₦239/kWh against ₦640/kWh or more from diesel.
Real-Time Remote Monitoring
Every InfraSol Business 60 includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone, 24/7. Automated fault alerts and monthly energy intelligence reports included.
Learn more about our monitoringReady to eliminate your diesel costs?
Get a free site assessment and see exactly what the InfraSol Business 60 would save you every month.
Also available via Lease-to-Own (30% down, then 3 monthly payments) or Energy as a Service (flat monthly fee). View financing options