Three-Phase Solar for an Office Floor, School or Restaurant
37.2kWp Solar · 3 × SRNE 12kW hybrid · 90kWh LiFePO₄ · ₦34.1M, or from ₦26.9M




60 panels3 × 12kW3 × 30kWhTwo ways to buy this system
Both use the same inverters. The cheaper version has less battery and fewer panels, and you can add to it later without changing anything else.




48 panels3 × 12kW2 × 30kWh- 29.8 kWp of solar (48 panels)
- 60 kWh battery, about 6 hours at 9 kW overnight
- Payback 1.2–2.1 years
- Add 12 panels and a third 30kWh pack later.




60 panels3 × 12kW3 × 30kWh- 37.2 kWp of solar (60 panels)
- 90 kWh battery, about 9 hours at 9 kW overnight
- Payback 1.3–2.1 years
Installed prices for an outright purchase, as of October 2026. Product photos show the equipment used; the counts are on each picture.
Ideal For
Office floor, school or larger restaurant on a three-phase supply, running a 30kVA generator
Office floor with 30–50 staff and 8–10 AC units
Private school running classrooms, labs and an admin block
Restaurant or event space with cold rooms and heavy lunchtime load
Small hotel running rooms and a kitchen
What This System Powers
8–10 units (1.5HP) in the day
One inverter per phase keeps the three phases balanced.
Cold rooms, chillers and freezers around the clock
Full premises lighting inside and out
All
40–60 workstations, servers and network equipment
Up to 2HP pumps: yes
Yes, including small commercial machines
Large motor loads and lifts. These need a load audit first.
Battery Autonomy
Overnight Scenario
At a typical night-time load of 9kW (cold rooms, CCTV, security lights and a few ACs), the 90kWh battery runs for about 9 hours. The cheaper version's 60kWh runs for about 6 hours.
System Specifications
| Solar Array | 37.2 kWp |
| Panels | 60 × Jinko Tiger Neo 620W N-type panel |
| Inverter | 36 kVA: 3 × SRNE 12kW hybrid |
| Phase | Three-phase (one inverter per phase), or single-phase |
| Battery Capacity | 90 kWh: 3 × Aurora 30kWh LiFePO₄ |
| Battery Chemistry | LiFePO₄ |
| Battery Cycle Life | 7-year warranty, over 6,000 cycles at 90% depth of discharge |
| Usable Battery Capacity | 81 kWh |
| Daily Solar Generation | 133.5 kWh |
| Monthly Generation | 4005 kWh |
| Solar Utilisation | 90% |
| Roof Space Needed | About 168 m² |
| Monitoring | InfraSol real-time remote monitoring platform |
Financial Payback
Savings are the solar energy a system produces and the customer uses, valued at what that energy costs them today. Output is 1,310kWh per kWp a year, the Lagos figure for a well-oriented, unshaded array after system losses; we count 75% of it as used in homes and 90% in businesses, and give the battery no credit for charging from the grid, so the payback is conservative. Generator fuel is derived rather than assumed: litres/hour ≈ 0.25 × kW drawn + 0.037 × rated kVA, at ₦1,920/litre. The second term is fixed burn proportional to the set's size whether or not anything is plugged in, which is why an oversized generator costs more per kWh than one that is worked hard. Most Lagos generators run at 40–70% of rating; across that band fuel alone costs ₦607–₦702/kWh on a well-maintained engine, about ₦640/kWh at a typical 55% load, and around ₦800/kWh on a worn, lightly loaded one. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120/kWh, which is what takes generator power past ₦700/kWh all-in. Band A grid is taken at ₦210/kWh. Conservative (₦366/kWh blended avoided cost): Band A home, 14–18 hours of mains, load weighted to the evening. Base case (₦531/kWh): Band B/C small business, roughly 10 hours of mains, mid-life generator. Optimistic (₦625/kWh): Band C/D commercial site with minimal grid and heavy daytime load. The more of your consumption falls in daylight hours, the faster the payback.
The Diesel Reality
A 30kVA generator running 12 hours a day burns roughly 1,260–1,910 litres of diesel a month, depending on how hard it is worked. At ₦1,920 a litre that is ₦2.4M–₦3.7M a month in fuel alone, before servicing, oil changes and the diesel that goes missing. This system moves the working day onto solar and covers outages from the battery.
Already on Band A?
Band A businesses still benefit. The array carries daytime operations, when a business draws most of its power, and the battery covers outages and the evening tail instead of the generator. Charged from Band A mains, stored energy costs about ₦239/kWh against ₦640/kWh or more from diesel.
Real-Time Remote Monitoring
Every InfraSol Business 36 includes InfraSol's real-time remote monitoring platform. Track solar generation, battery state-of-charge, grid usage, and system health from your phone, 24/7. Automated fault alerts and monthly energy intelligence reports included.
Learn more about our monitoringReady to eliminate your diesel costs?
Get a free site assessment and see exactly what the InfraSol Business 36 would save you every month.
Also available via Lease-to-Own (30% down, then 3 monthly payments) or Energy as a Service (flat monthly fee). View financing options